long-awaited new collection Alpinus must meet the expectations of the faithful members of that brand. Therefore, it uses a number of solutions hitherto unknown on the Polish market.
| | One is the One Touch - Graco rozstawiania tent. Even the most experienced tourists tent distribution usually takes a few minutes and with the help of another person. In the tents from the latest collection Alpinus this process is much shorter. This allows the frame construction, whose components are connected together with special fasteners, so that one person can deploy the tent in two minutes. One Touch system uses a universal Igloo tents and Biker triple, quadruple and family Galaxy Tourer 400th The materials used are polyester on the floor and the tropics, and in breathable polyester bedroom. Guaranteed waterproof to these models is 3000 mm and 10000 mm in the tropics for the floor. In the most extreme conditions, check the Expedition tents Huron, Sioux and Apache with solutions such as increased to 5000 mm, the degree of water resistance ripstopu tropic polyester, YKK zippers, lightweight anodized aluminum frame and przeciwśniegowy flange along the bottom edge. make the most of the tent, it is important to fully understand the rules for its operation. For this purpose, has created software Alpinus spreading tent step by step and practical attention to the user. Step 1 keep the tent upright ends of the masts up. Masts free fall to the ground forming a star shape around a central link in the middle. Step 2 Each of the main mast has two hinged connectors. Connector located closer to the central switch must be locked manually. Another locks automatically when the mast is fully tensioned. Step 3 Carefully raise the central switch and press the center of the mast so that the locking sleeve into its place. We must be careful not to restrict the movement of a sleeve inside which is a mast. It must be moved freely along the tube. Be careful not to trap the material and tapes in the links, because this may damage the tropic. Repeat the operation with the other poles until all tubes are on the right and tent sites can freely. Step 4 Mount vestibule, if your tent has it. Mast atrium must now be assembled by lifting up the middle connector until the two bottom switches are on their positions and pressing the tube down until it locks the locking sleeve connector and the other two auto-switching block also. It is important to note that the dismantling of the tent of the lower links and a central switch must be manually relieved by pulling the locking sleeves. Step 5 To make a tent to do the opposite of the unfolding. Remember that the rule is "nothing by force!" To make a mast in place we need to press the connector and pull the plastic ring. Lower switch automatically releases itself, unless the mast is still tight. Then we must grab the mast hand over the connector and shake from side to side - is released for sure. Here it is important to hold in one hand a central switch, to prevent the deposit of the tent before the release of all masts.
|
0 comments:
Post a Comment